Doomsday Bunker Upgrade Chapter 731: Print out the new city
Relying on various so-called "inside information", the news that the housing allocation in the new city will be mainly couples with children spread quickly.
Because of the instructions given by Chen Xin and the policy set by the high-level officials, the city government on the Xincheng side did not control the rumors. While letting the rumors spread, they also secretly allocated future housing Getting ready for work.
Send grass-roots staff to count the existing residents, classify them according to the situation, and preliminarily count the number of people who need to be divided.
According to the analysis of these preliminary statistical results, a preliminary distribution plan will be formulated in combination with the number of houses in the new urban area...
Although the new city is still in the stage of laying foundations, these preparations have been carried out in an orderly manner.
The construction aspect of the new district is progressing smoothly, even to the point of lacklustre.
If it is a large dome, it may also cause certain difficulties due to the high requirements and difficulty of construction, but for a small dome such as the new urban area, which is only a quarter of the area of a large dome, the construction difficulty is much less.
In addition, the construction team used 3D printing equipment to build the dome of the new city, which greatly improved the efficiency of both construction difficulty and construction speed.
So much so that after the foundation is leveled, the new city is still doing data classification, and a third of the dome and most of the houses have already been built there.
Although most of the houses are only blanks made with 3D printing technology, they have already begun to take shape.
As the person in charge of the project, Chen Xin naturally has to inspect the construction of the new urban area, and the inspection results are undoubtedly satisfactory.
3D printing technology is not a new invention, and the 3D printing equipment developed by Chen Xin just makes this technology more practical and more convenient to use.
As for building houses with 3D printing technology, in fact, this technology has been applied long before the disaster.
In addition, the built houses have great advantages in terms of seismic resistance, thermal insulation, sound insulation and other aspects, construction speed, and saving building materials.
It's just that before the disaster, the country of Yan belonged to a big country in infrastructure construction, with a large number of construction workers, and the land was relatively expensive. Obviously, 3D printing buildings were not very suitable. Therefore, although it has the world's advanced 3D printing construction technology, this technology application is not very extensive.
However, in this environment, in order to save building materials and reduce construction time and other factors, 3D printing construction technology has begun to be widely used.
In addition to the construction of domes and buildings on this side of the new city, this technology has also been applied to the construction of the Middle East defense line.
According to what Chen Xin learned, due to the wide application of 3D printing technology, the construction speed of both equipment and fortifications is at least twice as fast as the same period, and the work efficiency has been greatly improved.
And the construction speed of the new city is not too much. When Chen Xin inspected, he could even see the first floor of the building being built gradually with the naked eye.
“Academician Chen, look, the wall we are using 3D printing technology to build is such a hollow structure, and the interior is filled with such wavy lines to stabilize the structure, which not only saves building materials, but also improves construction efficiency. , if it is built manually, both the construction efficiency and the construction materials will consume more than now." The engineer in charge of the on-site construction explained to Chen Xin proudly, obviously for this 3D printing construction technology, he is very proud.
Chen Xin can understand the pride of the engineer. In fact, he has the same expression when explaining what he has come up with.
So Chen Xin did not interrupt the engineer's explanation, but let the other party play freely.
Just noticing that the workers filled the wall with a kind of white powder after the wall was printed, Chen Xin asked curiously: "What are you adding?"
"It's a thermal insulation material, because the construction requirements say that it needs to be thermally insulated, so we filled it with this thermal insulation material. The main components are asbestos and glass fiber. In addition to thermal insulation, it can also effectively sound insulation. The effect is very good." The engineer explained to Chen Xin, and by the way, he took a little thermal insulation material from the bag on the side, and showed it to Chen Xin in his hand.
Simply glanced at these insulation materials, and Chen Xin nodded with satisfaction: "You are doing well, the construction progress in the new urban area is faster than expected, which is very good, and we must continue to maintain it. In pursuit of construction speed, we must not neglect construction quality, we must ensure that everything meets construction requirements and standards, and there are no potential safety hazards.”
"You can rest assured, academician!" On this issue, the engineer seemed confident. He pointed to the 3D printing equipment that was working on the side and said, "Humans may make mistakes and be negligent, but machines cannot There will be mistakes, and there will be no negligence, and our engineering quality is definitely better than manual construction!"
This is true. It is true that people can make mistakes, but as long as the machine does not fail, there will be no errors, and the quality of the project is absolutely stable.
So Chen Xin just smiled and encouraged the engineer's attitude.
After explaining a few more words, Chen Xin came to a building that had been capped and began to be decorated by decoration workers, and inspected a house that had completed the initial decoration.
This is a 50-square-meter house~IndoMTL.com~ According to the design and planning, there are two bedrooms and one living room, with complete kitchen and bathroom facilities, which can accommodate a family of three.
Because the total area is only 50 square meters, although the designer spent a lot of thought on the decoration to improve the comfort of use, the room is still not large in general.
The two bedrooms are of the same size, one can be used by the couple and the other can be used as a children's room, and after the completion of the decoration, the children's room can also be divided into two relatively independent spaces .
If the family continues to grow, they can apply for a larger house.
Although according to the currently discussed regulations, families with two children over the age of 5 can apply for a house of 70 square meters, but at present, it will still be controlled according to the situation as much as possible.
And even if you apply, you may end up with a 50-square-meter house, because the number of 70-square-meter houses in the entire new urban area is not much, accounting for only about one-fifth, while 50-square-meter houses are the most, there are Two-thirds are of this type, but according to the number of children, the interior decoration and interior space division are different.
As for the remaining part, it is a 30-square-meter apartment for families who are newly married and have no children, or who are planning to raise children.