Doomsday Bunker Upgrade Chapter 722: Dome City Project Restart
While Chen Xin was busy making artificial intelligence, the scientific research department on the new dome city received instructions from their superiors, asking them to restart the construction plan of the dome city.
The construction plan of the dome city is an important project of the country before the invasion of alien creatures, which is related to the national economy and people's livelihood, and the reconstruction of the ecological environment of Blue Star in the future.
Therefore, when the country was just recovering from the predicament after the disaster, it still invested a lot of resources to build the new dome city, and planned to invest enough scientific research in it to study the coexistence and development of the ecosystem and human beings The problem.
According to the original plan, after the completion of the new dome city, the state will build more ecological domes within three to five years, and expand the new dome city into an urban agglomeration.
However, with the invasion of alien creatures, the construction of the new dome was cancelled, the entire plan was shelved, and various resources were sent to the front line against alien creatures. The cost of the dome city is huge, and Plans that do not help the war are naturally suspended.
And the only finished product of the entire dome city construction plan has also become a resettlement site, housing a population that far exceeds the design capacity limit.
Now with the end of the civil war and the restart of various construction projects, this large-scale construction project that was previously suspended has naturally been restarted under the promotion of some people.
However, the construction of the dome city is quite expensive. Even if the high-level wants to restart the construction of the dome city, it will not be able to start construction immediately in the short term.
Especially after the project has been stopped for a few years, although the original drawings are still there, it will take time to sort out.
You must know that even the blueprints of an airplane can fill a container, let alone the blueprints of a city?
Even if these drawings have been paperless, they are still huge amounts of data that will take time to rearrange.
Especially in the problems encountered during the construction of Dome New City, the revisions made on the drawings used for construction should also be fed back to the original drawings.
This is undoubtedly a huge project and requires a lot of manpower to do these things.
And these people have to be professionals, and ordinary people can't handle these architectural drawings.
As a result, several design institutes and their subordinate design institutes that still exist in China have been recruited, and a large number of professionals have been concentrated in the scientific research center, and some of them have been surveyed and mapped in the dome new city.
Surveying and mapping the dome new city, this is naturally what it should be. When this new city was built, it was not designed to accommodate hundreds of thousands of people, and the space in the city was not allowed.
But what happened later forced the city to be forced into the hundreds of thousands of people, which undoubtedly made the city's original architectural plan a mess, and many original designs were also revised.
Re-survey to compare the current Dome with the original drawings.
As for the reason for going to the scientific research center, this is naturally the reason why the electronic version of the design drawings of the new dome is stored in the supercomputer in the scientific research center.
In addition, the scientific research center is large, and there is a virtual illusion. You can directly simulate the drawings and calculate the difference through a supercomputer. Isn't it easier than comparing the vast sea of drawings and data by yourself?
————————————
Chen Xin is surprised that the country wants to restart the construction of the dome city.
In his capacity, he can naturally have access to more information that others cannot. Through this information, Chen Xin can clearly understand that the current situation in the country is not as good as he imagined.
Although the end of the civil war, the country will focus on domestic construction, but now on the one hand it has to support the European battlefield, on the other hand, it has to build a new line of defense in the Middle East. It can be said that the domestic resource consumption is still very large.
Although there are European supplements, and the small mines contracted by individuals in China also provide considerable output, generally speaking, the current domestic life still needs to be calculated.
Chen Xin does not agree with restarting the large-scale construction project of the dome city at this time.
In particular, the original design of the dome city was to build an ecological city, not a residential city. The difference between them is huge.
He doesn't think the country now has enough resources and energy to restart the original ecosystem restoration research project.
It's not that this project is unimportant, but because it's not the most important thing right now, and a lot of resources shouldn't be spent on it.
However, although he did not agree with the high-level approach, Chen Xin did not interfere, but only asked the high-level about this matter through his own authority.
In fact, it's a very strange thing that Chen Xin didn't know about this in advance.
As Chen Xin, if the country wants to restart the construction project of the dome city, he should know in advance.
Especially at the beginning of the project of the Dome City, he managed it, and now he has the most say in the new Dome City. It is very unusual that the project restarted without him.
However, when Chen Xin asked the executives about this matter, the executives replied that the dome city plan was not prepared for domestic construction, but intended to be used in the Middle East.
This really surprised Chen Xin, even more surprised than the high-level officials bypassing him directly to confirm this matter.
Although it is said that the construction of the dome city is very resource-intensive, if it is crowded, it is not a problem to build two new domes, but why will the new domes be built in the Middle East instead of China?
This is really unreasonable~IndoMTL.com~ The high-level explanation for this is that the high-level person responsible for the construction of the Middle East defense line feels that the current population of the Middle East is concentrated on the Mesopotamian plains It is a very dangerous thing. If alien creatures invade the Middle East, the residents of this area will suffer huge losses.
Therefore, this high-level executive intends to migrate the population of the Middle East to the Iranian plateau, and let them relocate behind the Middle East defense line, so that even if alien creatures invade, they will not suffer huge losses.
Of course there is no problem with this plan, but the Iranian plateau is mainly a plain terrain. If it is used to build a shelter, it is obviously not suitable for an underground building. At this time, a large shelter such as a dome city suitable for construction in the plain area is natural. became the top choice.
It is precisely because of this idea that this high-level executive restarted the Dome City project with his own authority, allowing the country to sort out the drawings.
It is precisely because of this idea that this high-level executive restarted the Dome City project with his own authority, allowing the country to sort out the drawings.
It is precisely because of this idea that this high-level executive restarted the Dome City project with his own authority, allowing the country to sort out the drawings.