Doomsday Bunker Upgrade Chapter 515: Environmental construction


“Currently, the land clearing and leveling work has been completed. We are currently excavating the foundation of the dome and the foundation of the urban architectural planning part.” In a conference room of the construction site, the engineer is introducing the construction of the project to Chen Xin schedule.

The excavation of the building foundation is the top priority of the entire construction project, and it is not too much to regard it as the most important part in a sense.

The foundation of a "high-rise building from the ground up" is the foundation that determines whether the building is firm and durable.

If the foundation of a building is not good, even if the building is built, it is a paper house that can be pushed down.

For the country of Yan, which is a big country in infrastructure construction, there is no need to emphasize this point. The engineering team of Yan country can complete the construction according to the requirements of the project without being reminded.

"Well, I've seen this just now, and it looks like you're doing a good job." Chen Xin had a smile on his face, as if he was very satisfied with the construction progress of the engineering team.

Hearing Chen Xin say this, the engineer smiled immediately. Although Chen Xin was not his superior leader, it was obvious that Chen Xin's approval was still something to be happy about in his opinion.

However, in addition to his praise, Chen Xin also asked the engineer: "Did you excavate the foundation of the building first, and then construct other supporting facilities?"

This is what Chen Xin was curious about when he inspected the construction site just now. The workers are excavating the foundation, and the excavation is very deep, but it is basically limited to the construction area planned on the design drawing.

The rest of the land has only been leveled and not excavated.

However, according to the design drawings, various supporting facilities will also be built on the land that is not part of the building, so Chen Xin has this question.

After all, this is a whole city, and it is impossible to build only houses, and supporting facilities such as sewers, drainage pipes, heating pipes, etc. will also be laid, not to mention city-level power supply lines and dome lighting systems .

In the future, in this dome city, lighting will be used to simulate changes in light to artificially create the difference between day and night.

"Yes, according to the construction plan, the progress of this phase is mainly to excavate the building foundation. As for the supporting facilities, according to the construction plan, the construction will be carried out after the foundation is completed." The engineer explained to Chen Xin At the same time, although Chen Xin is not his boss, Chen Xin's identity is undoubtedly more important than his boss, and the engineer needs to answer any questions he has.

After listening to the engineer's explanation, Chen Xin didn't have any special views or opinions. He didn't know much about engineering construction, and he only asked about the things he didn't understand.

However, after the engineer explained, Chen Xin nodded knowingly and didn't ask any more questions.

On the other hand, a designer on the side took the initiative to speak at this time and said to Chen Xin: "This is mainly caused by the special situation of the dome city. According to our plan, the heating energy tower and the main body of the dome will be installed first. After the construction is completed, the temperature under the dome is raised to restore the temperature of the entire construction environment to above zero, which can greatly reduce the difficulty of construction and allow the original construction machinery to function.”

Chen Xin can understand this point. Most of the original construction machinery used diesel, and when the diesel reaches the environment of minus tens of degrees, even the high-grade diesel is easy to condense, which makes the diesel engine unable to start.

Not to mention that these construction machines are of very rough design, and the cab is not designed to protect against wind and cold. Even if the driver has protective clothing, the joystick will freeze.

However, if there is dome insulation, the temperature of the construction site under the dome can be raised to above zero, and these construction machines that are already unusable can naturally come in handy.

After all, even with the help of the Engineering Titan, digging on frozen soil and digging on ordinary soil are two completely different difficulties.

So when the construction plan was formulated, someone proposed to complete the dome and energy tower first, so that the energy tower could be used to obtain electricity for the construction site construction, and the temperature of the entire construction site could be warmed up by the insulation of the dome. Let the frozen soil thaw and reduce the difficulty of construction.

"This point has been determined before, but I'm not worried." Chen Xin nodded and talked about another thing: "The Dome City is an ecological city, and the ecological environment is very important for this city. is the most important, so I hope you will also pay attention to this issue during the construction process.”

It is impossible for Chen Xin not to emphasize this issue. The design of the Dome City emphasizes its important role in rebuilding the ecology. Therefore, all parts of the entire city are built around the core of green ecology.

Not only are there all kinds of green plants in the city, but also the design of a series of supporting facilities such as water circulation and garbage disposal in the city adopts the most environmentally friendly design, in order to enable the city to create a perfect environment in the future. ecological environment out.

And the construction itself is the most ecologically damaging. Even if you pay attention to the construction process, this will still have an impact more or less.

Chen Xin's reminder also hopes to minimize its impact on the ecology during the construction process.

Even if there is no ecology on the construction site of the dome city, when the dome is built, this is a problem that must be faced. If you are not prepared now, it will be a big trouble if something goes wrong in the future. .

For this issue, both engineers and designers have long kept it in mind~IndoMTL.com~ They also paid attention to this during the previous construction process.

Now that Chen Xin brought it up again, both of them nodded in agreement and said, "Academician, please rest assured, we will not be careless about ecological issues."

While guaranteeing Chen Xin, the engineers also emphasized their efforts in the construction process: "We strictly follow the construction requirements during the construction process, and the protection of the environment and ecology has also been It was implemented on everyone's head from the beginning.

All workers have received relevant education and relevant responsibilities have been clearly identified, and we will make every effort to ensure that the entire construction is safe.

As for the impact on the ecological environment during the construction process, the parts that can be restored will be restored after the construction is completed, and the parts that cannot be restored will be minimized as much as possible to ensure the ecological and environmental impact during the construction process. impact is minimized. "

"I'm relieved to hear you say that." The smile on Chen Xin's face was even greater when he heard the engineer say this.

Since it has been decided that he will live here in the future, Chen Xin certainly hopes that his new home will have a better environment in the future.


Leave a Reply