Doomsday Bunker Upgrade Chapter 251: Evaporating snow


When Chen Xin, Qin Lan and Mo Qingyan came to the original railway station in Linshi, what they saw was a ravine that looked like a canyon and was completely buried by snow. It was almost impossible to see that the building existed. Traces of the snow field.

The gully is the original railway, although there is a certain amount of snow on it, but there are often trains passing by, so that there is not much snow on the railway, so that a gully-like trace is left in the snow.

The railway station in Linshi is a fourth-class station in the station classification before the Flame Kingdom disaster, which is only one level higher than the lowest-ranked station for trains to pass, overpass, and overpass.

The station itself is a small one-story building, even lower than the surrounding houses. After the blizzard blew, it was naturally buried completely by the snow, leaving no trace.

Before the disaster, it was a small station that only had five trains a day, so there was no need for a bigger place.

Although Linshi was also trying to expand the railway station and build a loading and unloading station before the disaster, it is clear that this work has not been completed.

From the ravine formed by the passing of the train, you can still see some traces of the loading and unloading stations built before. After all, Linshi still has to load and unload the trains that bring them supplies here.

It's just that the surrounding snow is nearly ten meters deep. Standing next to the ravine and looking down is like looking down from the roof of a four-story building. It is not worth mentioning in front of the mighty power of nature.

However, although the snow here is deep, a large piece has been dug up, forming a relatively gentle slope.

This is obviously the place where Lingshi is used for material loading and unloading. Otherwise, it would not be an easy job to jump from the four-story snow-covered roof to the rails below each time when loading and unloading materials.

Even if you can't fall to death in the snow, it's impossible to get the supplies up from such a height without digging a slope.

"Axin, how are you going to dig out the train station? Although the train station is not big, but with so much snow, even if you have enough manpower, you will have to dig for several days, right?" Beside Xin, he carefully glanced at the railway below and asked Chen Xin.

Chen Xin shook his head, and he said helplessly about Qin Lan's question: "How many days? Alan, you underestimate the workload. Even if you have two hundred people, it will cost you at least ten to dig out the train station. It takes half a month for them to be equipped with exoskeleton protective suits. Otherwise, if you dig for a month or two, you may be able to dig to the original roof of the train station.”

"Ah? In that case, how are you going to dig out the train station?" Qin Lan couldn't understand what Chen Xin was thinking.

It is obvious that they want to come to the field to investigate how to dig out the railway station so that the train loading and unloading can be more efficient, but now they say that even if there are enough people, the railway station cannot be cleared in a short time. This is not Contradictory?

"Of course I didn't dig with my hands, that would be too inefficient, and there wouldn't be enough manpower." Chen Xin walked towards the **** in front, sliding down the slope, and continued to Qin Lan, "I came here because I wanted to. Let's see if there is any way to clear the snow more effectively, it doesn't require a lot of manpower, even if the time is a little slower, it's actually easy to say."

"Then have you come up with a solution?" Qin Lan also slid down with Chen Xin. Both of them were wearing power armor. It was more convenient to slip down than to walk down.

Standing at the bottom of the gully and looking up, I feel more intuitive about the thickness of the snow. Chen Xin turned on the measurement function of the robotic arm and measured it and found that the thickness of the snow is 10.12 meters. Relying on people to dig, it is quite a huge project to clear the train station.

Even with the help of construction machinery, it's not an easy job.

As for clearing only one platform to facilitate unloading, this is possible, but the current problem is that Linshi simply cannot spare staff to do this.

So now either wait for the situation in the neighboring city to improve, and the patients with mild symptoms recover and get enough labor, or wait for the city to find a way to send new reinforcements, or Chen Xin can think of a way to put the current ten Many meters of snow evaporated directly.

Evaporation is actually a feasible idea. As long as a large enough heat source can be created to raise the temperature within the railway station to above zero, and the snow melts, it only takes a few days to melt the snow here.

But the problem is that in the current environment, to create a large enough heat source, regardless of where the energy comes from, after the heat source is produced, how to ensure that the heat can be diffused throughout the train station is also a problem.

Although the fourth-class railway station is only a few hundred meters long and looks small, but such a large area needs a heat source to maintain heat and evaporate the snow here, all Chen Xin can think of is " The heating field that the energy tower and heating hub in the game "Frozen Age" can create.

Fortunately, this is not completely impossible for Chen Xin. After all, he was thinking about this issue before, but now he is not using the energy tower to build a greenhouse, but to dig a train station first.

Just want to build an energy tower, in addition to needing a lot of materials, you also need to drill a deep enough geothermal well.

The problem of materials is easy to solve. Chen Xin now has an electromagnetic metallurgical furnace. With this furnace, he can completely obtain materials for building energy towers by recycling the scrap metal in the city.

But drilling a deep enough geothermal well requires not only professional equipment, but also professional drillers.

Thinking of this, Chen Xin reacted, isn't there a drilling expert in Linshi?

So Chen Xin hurriedly asked Qin Lan: "Alan, how was his condition when you went to 'Daren' yesterday?"

"The situation of 'Daren'? His situation is not bad~IndoMTL.com~ He dug a hot spring when he was digging a well for himself, and he can live a good life by relying on the hot spring, Ah Xin, you ask this Well? Are you looking for him?" Qin Lan heard that Chen Xin seemed to need the "drilling expert" to do something for him.

Chen Xin nodded and said to Qin Lan: "Then let's go to 'Master', I need him to help me drill a well."

"Drilling? But Ah Xin, weren't you talking about clearing the snow from the train station? What does drilling have to do with this?" Qin Lan was confused by Chen Xin, she didn't understand drilling and clearing snow How are they connected.

Chen Xin raised the corners of his mouth quite confidently, and smiled at Qin Lan: "The answer was just mentioned by you, Alan, didn't you? 'Master' dug up the hot spring, so he can rely on the hot spring to resist the cold, so I want him Help me dig a deep well, and I'm going to use the geothermal heat to evaporate the snow here."

Book Reading House

Dear, click in, give a good comment, the higher the score, the faster the update, it is said that the new full-point score found a beautiful wife in the end!

The new revision and upgrade address of the mobile station: Sync data and bookmarks with the computer station, and read fresh without ads!


Leave a Reply